Skip to main content
Regina & area concrete contractor · Free written estimates
(306) 994-0126

EV Battery · Clean Room

Particle-Verified Clean Room Flooring for Regina Facilities

ISO-rated clean rooms demand flooring that does not shed particles, does not release chemical vapors, and does not interfere with the controlled airflow the room depends on. Regina Concrete installs seamless epoxy and urethane systems engineered for clean room specifications, with grounding where ESD control is required and post-install verification that confirms the floor meets your particle budget. Free written estimate on every project.

  • Seamless, particle-verified install
  • Low off-gas chemistry for sensitive processes
  • ESD grounding where required

The challenge

Why Standard Floors Fail in Clean Room Environments

A clean room's ISO rating depends on particle count per cubic meter of air. Every surface in the room contributes to that count. Untreated concrete continuously sheds microscopic particles under foot traffic and air movement, consuming the particle budget before production even starts. A properly specified clean room floor system seals the slab, eliminates particle shedding, and holds the room's ISO classification.

We install smooth seamless epoxy or urethane systems selected for the specific ISO class, with chemistry that does not off-gas at operating temperature and grounding resistance matched to any ESD requirements. The install follows clean room discipline: controlled-environment prep, sealed transitions at every wall and penetration, and particle-count verification after cure.

Our EV battery flooring work includes clean room zones alongside ESD-controlled manufacturing floors in adjacent spaces, with ready-mix concrete and system coordination across the entire facility.

Recent work
seamless clean room floor in a Regina sealed-process facility
particle verification testing on a clean room concrete floor

Installation sequence

How We Build Clean Room Floors in Regina

  1. Determine ISO class and material spec

    We identify the target ISO class, the particle contribution budget the floor must meet, any ESD or grounding requirements, and the off-gas chemistry limits for your process. Material selection is locked to the class.

  2. Prepare slab in controlled conditions

    The concrete slab is prepped using HEPA-filtered or isolated methods to prevent contamination of adjacent clean spaces. Surface is ground to the system profile, cracks are sealed with clean-room-rated materials, and moisture is verified.

  3. Apply seamless epoxy or urethane

    The system is installed as a continuous seamless layer across the room footprint with no joints or seams in the occupied space. Topcoat is selected to meet the off-gas and particle-shed specifications your process requires.

  4. Verify particle count and ESD resistance

    After full cure, particle count testing confirms the floor's contribution is within your ISO budget. ESD resistance is verified where required. Certification documentation is provided for clean room commissioning and validation files.

Critical detail

Transitions Determine Clean Room Floor Success

A perfect seamless floor across the room footprint can fail at the boundaries. Doorways, wall-floor junctions, pipe penetrations, and equipment pads are where most clean room floors lose integrity. We detail every transition with seamless cove base, sealed penetrations, and integrated door frames so the floor's particle-control performance holds at the room perimeter.

Coordinate with chemical-resistant flooring in adjacent non-clean zones and with EV battery production areas that share facility infrastructure.

Request clean room quote
clean room floor with seamless transition detail and ISO verification documentation
Seamless Room footprint
Verified Particle + ESD
Free Written estimate

Related EV battery services

Explore Other EV Battery Flooring Options

Clean room is one of two specialized EV battery floor systems we install. See the other.

All EV battery services

Common questions

Clean Room Floor Questions, Answered

ISO class, particle budget, off-gas chemistry and transition details.

Multiple classes from less strict to more strict, with the floor system spec matched to the class. We confirm the target class up front and select the matched system; higher classes require lower-particulate materials and stricter install discipline.
Yes, significantly. A standard floor sheds particles continuously; a properly specified clean-room floor contributes far less. In an ISO-rated environment, every surface counts toward the particle budget.
Floor systems can off-gas trace chemistry that contaminates sensitive processes. We use chemistry rated for low off-gas in clean room applications, verified by the manufacturer for your specific class requirement.
Yes, transitions are where most clean room floors fail. We detail every transition (wall, door, penetration) with seamless cove and sealed integration so the floor's clean integrity holds at the room boundary.
Per room, typically a week or more depending on size and ISO class. The cure window before clean room commissioning adds additional time. The full schedule is in the quote and built around your commissioning calendar.

Client reviews

What Regina Operations Say About Their Clean Room Floors

★★★★★ 4.9 · 87 reviews on Google
Read all reviews →
★★★★★

ISO-class verified at commissioning with our floor as part of the particle budget. Hit class, room ran first try. The seamless transition detail at the door made the difference.

Z. J5
Clean Room Operations, Regina
★★★★★

Off-gas verification on the floor chemistry for our sensitive process. No detectable contamination at the production analytical limit. Spec matched the process requirement exactly.

Y. J5
Process Engineer, Regina
★★★★★

Multiple clean rooms across our facility, each at different ISO classes. They specced per room rather than one system everywhere; class targets hit in every room first commissioning.

Q. J5
Facility Engineer, Emerald Park
★★★★★

Documentation package supported the validation file. Material specs, install method, particle verification all included. Auditor signed off without revisions.

X. J5
Validation Lead, White City

Ready to start

Get a Free Clean Room Floor Estimate

Provide the ISO class, room dimensions, and your commissioning timeline, and we will specify the matched system and deliver a written quote.

We assess the clean room and send a written quote within one business day.