Driveways & Patios
Floors & Foundations
Floors & Flatwork
Sites & Facilities
Floors & Coatings
Facilities We Serve
Brands · BASF Master Builders
Engineered BASF Master Builders Solutions for Regina ICI Projects
When a warehouse floor, parking deck or foundation needs to hold up for two decades under real-world loads, BASF Master Builders Solutions is the chemistry we reach for. Regina Concrete installs MasterSeal, MasterTop and MasterFlow to the exact protocol BASF engineered them for, with documentation and warranty intact. Call for a free written estimate.
- Protocol-driven installation
- Full system documentation
- BASF warranty preserved
Three product lines, one protocol
How BASF Master Builders Solves Industrial Concrete
Industrial and commercial concrete has to survive traffic, temperature swings, chemical exposure and movement. That is why we specify MasterTop polyurethane and epoxy floor systems on warehouse and manufacturing work, where a standard coating will fail in two or three years.
Below-grade structures and parking decks get MasterSeal waterproofing, engineered for the freeze-thaw cycles and structural movement Regina sees. And where machinery or structural connections need to transfer load without shrinkage, MasterFlow precision grouts hold the connection true.
All three are part of the same BASF chemistry family. We install them together on warehouse floors, parking structures and manufacturing facilities across Regina, always to the published MBS protocol.
Installation sequence
Installing BASF MBS Systems the Right Way
-
Assess the concrete and environment
We evaluate the substrate, the loads it will carry, chemical exposure, temperature swings and the warranty target, then select the MBS product line that matches the actual conditions.
-
Prepare and prime the slab
Concrete is mechanically prepped, cracks are repaired, and the MBS primer designed for that specific system is applied to ensure adhesion and performance.
-
Apply the system in layers
MasterTop, MasterSeal or MasterFlow is installed in the sequence and thickness BASF specifies, with on-site verification of mix ratios and lift measurements.
-
Document and hand over
Each layer cures on schedule, performance testing is done where required, and a complete project file with data sheets and as-built notes goes to the owner.
Three systems, one standard
When to Specify MasterTop, MasterSeal or MasterFlow
MasterTop is the choice for industrial floors where the wear is predictable and hard. Fork-truck traffic, hot-tire pickup, washdown and impact all demand a polyurethane or MMA system engineered for those loads. A generic epoxy will soften and fail.
MasterSeal waterproofing is specified on parking decks, plaza decks and below-grade structures because it is engineered for the movement, traffic and freeze-thaw cycles those structures see. The chemistry holds up where standard membranes crack.
MasterFlow grouts go under base plates, machinery and structural connections. They set without shrinkage, so the load transfer stays true and vibration is controlled. Standard mortar shrinks and loses contact.
BASF Master Builders product lines
The BASF MBS Systems We Install
MasterSeal waterproofing, MasterTop floor systems and MasterFlow grouts, installed to BASF protocol.
BASF MasterSeal Waterproofing
Waterproofing for parking decks, plaza decks, foundations and below-grade structures.
Learn moreBASF MasterTop Floor Systems
Polyurethane, MMA and epoxy floor systems engineered for industrial and commercial wear.
Learn moreBASF MasterFlow Grouts
Precision grouts for base plates, machinery and structural connection load transfer.
Learn moreCommon questions
BASF Master Builders Questions Answered
MasterSeal vs MasterTop, protocol, ICI scale and warranty in Regina.
MasterTop in our production area. Polyurethane system that takes the hot-tire and fork-truck punishment without softening. Replaced the floor we were patching every year.
MasterSeal on the parking deck. Sealed, flexible, and through one freeze-thaw season already without a single fresh leak below.
MasterFlow under our new equipment base plates. Set true, no shrinkage gaps, vibration is controlled. Done by the spec, not the rule of thumb.
They installed BASF MBS the way the spec called for, with the project file at the end. Made the building owner's warranty paperwork actually defensible.
From the blog
Concrete Guides & Articles
Practical reading on planning, finishes and caring for concrete in Regina.
Ready to build
Get Your Free BASF MBS Estimate
Whether it is a waterproofing scope, a wear floor or precision grout work, send us the spec and we will build it to the MBS protocol and deliver a written, itemised quote.
We will spec the MBS system and send a written quote within one business day.